Name
Case study: Site water balance at a new mine: Keeping pace from first gold pour to expansion
Date & Time
Tuesday, April 27, 2027, 11:30 AM - 11:50 AM
Description
  • Building a site water balance that keeps up as a new mine expands at a fast pace 
  • Reconciling metered flows, model estimates and what’s really happening on site, and fixing the unaccounted-for water 
  • Moving from a volume balance to a load balance, so water quality and discharge risk are tracked together through expansion 
  • Planning water and tailings infrastructure ahead of growth, and increasing recycling between process, tailings and dewatering