Nom de session
Speeding up closure: Can reinjection shorten groundwater recovery by decades?
Date et heure
mardi 27 avril 2027, 11:50 - 12:10
Description
- Finding the optimal reinjection distance: far enough to limit flow back to the pit, close enough to speed recovery
- Weighing the extra pumping costs now against faster closure later
- Managing layered aquifers, water quality and clogging risks